300,000-person PCU demonstration city in the Sahara. Solar desalination towers. Membrane Array B-7 running past rated tolerance — classified failure window 14–20 months.
Three hundred thousand people in the middle of the world's largest desert. The PCU built this gleaming city as proof-of-concept. Solar-powered desalination towers ring the perimeter. Plasma emplacements crown every wall. The palace complex maintains security rotations unchanged for six years.
Membrane Array B-7 runs 22% over rated sediment tolerance. Chief Engineer Farrukh Tashkentov filed a classified report projecting failure within 14–20 months. The PCU approved strategic deferral on repairs rather than importing specialists. The report was suppressed. The water still looks clean.