Southern Processing lead engineer. Filed maintenance report projecting membrane failure. Administratively reassigned after report crossed The Prophet's desk. Made a copy first.
Chief Engineer at Southern Processing. Conducted maintenance assessment of Membrane Array B-7. Projected failure 14–20 months if not repaired. Report classified and his reassignment came when the report reached the Prophet's office.
Made a copy of the classified report on a sealed datacard before reassignment. PCU believes the second copy was destroyed. It was not. He knows what's in the water. He knows when it stops being in the water.