Twelve desalination towers, Membrane Array B-7 primary treatment stack. Running 22% over rated tolerance. Failure projects 14–20 months. Maintenance report classified.
Twelve desalination towers feeding Membrane Array B-7 — primary treatment stack for potable output. Security in layers: uniformed patrols, plain-clothed faith monitors, drone coverage, double-scanning checkpoint on the single access road.
Membrane Array B-7 runs 22% over rated sediment tolerance. Chief Engineer Farrukh Tashkentov filed a classified maintenance report projecting failure within 14–20 months. After failure, treatment output remains visually clear 8–12 days before biological contamination becomes detectable. PCU approved strategic deferral.