World / Saharan Oasis Megacity
PLACEsitePCUdevelopment record

Southern Processing — Saharan Oasis

Twelve desalination towers, Membrane Array B-7 primary treatment stack. Running 22% over rated tolerance. Failure projects 14–20 months. Maintenance report classified.

As of2060
Coordinates16.740, 8.030
WithinSaharan Oasis Megacity
Deskcanon-doc
◆ Open on the globe? Ask about this

Field record

Twelve desalination towers feeding Membrane Array B-7 — primary treatment stack for potable output. Security in layers: uniformed patrols, plain-clothed faith monitors, drone coverage, double-scanning checkpoint on the single access road.

Membrane Array B-7 runs 22% over rated sediment tolerance. Chief Engineer Farrukh Tashkentov filed a classified maintenance report projecting failure within 14–20 months. After failure, treatment output remains visually clear 8–12 days before biological contamination becomes detectable. PCU approved strategic deferral.

Connections 2

located in
Saharan Oasis Megacity
controlled by
Petro Caliphate Union · globe faction tag as of 2060

Sources

Record status: development · in-world reliability confirmed · desk canon-doc · id southern-processing