World
NARRATIVEcampaigndevelopment record

First Contact

Introductory campaign. Flooded London, 2060: three boroughs depend on a single desalination relay for clean water, a faction with a privatization agenda has compromised it, and operators are the quiet answer. Three linked missions.

As of2060
WhereFlooded London, Southwark, Bermondsey
Deskmission
◆ On the globe: Flooded London▶ Play →? Ask about this

Who is here

People

Adaeze Eze
person · character · as of 2060
Her connection to the relay sabotage is one of the four things operators must resolve in the final forty-eight hours of First Contact.
Duskline
person · character · as of 2060
First Contact campaign veteran, currently operating in Flooded London. Knows which of his campaign ops caused a civilian infrastructure breach that stayed offline eleven days past the mission timeline. The downstream count was real. He closed the report as directed.
Fenn
person · character · as of 2060
Holds the physical copy of the evidence operators need for the Free Zone Dispatch before the treaty vote.
Vasari
person · character · as of 2060
Requested Southwark specifically. Her superiors are testing whether controlled infrastructure sabotage can force municipal privatization across the borough system; she is in Flooded London personally for the treaty vote.

Archive

Connections 8

Sources

Record status: development · in-world reliability confirmed · desk mission · id first-contact