World / Flooded London
PLACEdistrictdevelopment record

Bermondsey

Borough of Flooded London on the relay. In 2060 the second WHISPER DECK device was installed at the Bermondsey desalination plant.

Explore the placeFind something to play
Coordinates51.497, -0.070
WithinFlooded London
Deskcanon-doc
◆ Open on the globe? Ask about this

Place

Districts and sites

Bermondsey desalination plant
place · site
One of the three borough desalination points on the relay. The second WHISPER DECK device was installed here in 2060.

History 1 dated records

Play

First Contact
narrative · campaign · as of 2060
Introductory campaign. Flooded London, 2060: three boroughs depend on a single desalination relay for clean water, a faction with a privatization agenda has compromised it, and operators are the quiet answer. Three linked missions.

Connections 3

Sources

Record status: development · in-world reliability confirmed · desk canon-doc · id bermondsey